greenspanconcepts.com

Pipeline Integrity Restoration Project at Mmahu, Egbema

Oceanklass Solutions Limited, in collaboration with Greenspan Concepts Limited, is executing the Sectioning for Leak Search and Sectional Replacement Project along the 10-inch Egbema West Delivery Line Right-of-Way. The project is aimed at identifying and addressing pipeline integrity concerns through systematic leak detection, replacement of affected pipeline sections, non-destructive testing, recoating, and restoration activities.

The project forms part of ongoing efforts to ensure the safe, reliable, and efficient transportation of hydrocarbons while maintaining compliance with industry standards and operational requirements. Through the deployment of experienced personnel and specialized equipment, the project supports asset integrity management and operational continuity.

Pipeline integrity is sustained through timely intervention, quality workmanship, and uncompromising safety standards.

Project Management Team

Scope of Work

The project was designed to:

  • Accurately locate and verify defect points identified through Intelligent Pigging (IP)
  • Assess pipeline wall integrity using advanced NDT techniques
  • Repair defects using engineered sleeve installation
  • Restore pipeline strength and ensure operational safety
Site mobilization and preparation.
Leak search and pipeline sectioning activities.
Excavation and exposure of pipeline sections.
Removal and replacement of defective pipeline sections.
Welding and fabrication works.
Surface preparation and cleaning of welded joints.
Non-Destructive Testing (NDT) and radiographic inspections.
Holiday detection and coating integrity verification.
Demobilization and project close-out
Mechanical backfilling and site restoration.

At vero eos et accusamus et iusto odio dignissimos ducimus qui blanditiis praesentium voluptatum deleniti atque corrupti quos dolores quas molestias excepturi sint occaecati cupiditate similique.

Working Process

Significant progress has been achieved on the project, including the completion of manual bush clearing within the manifold area, successful execution of weld surface preparation, completion of Wet MPI inspections, and radiographic testing of welded joints. Mechanical backfilling activities are also advancing steadily, contributing to the overall restoration of the work site.

01
Step

Site Mobilization and Safety Preparation

The project team mobilized personnel, equipment, and materials to the work location. Daily toolbox meetings were conducted to communicate work objectives, identify potential hazards, and implement appropriate control measures before commencement of operations.
02
Step

Pipeline Repair and Quality Assurance

Following the sectional replacement activities, welded joints were subjected to surface cleaning to remove contaminants and prepare them for inspection. Final Non-Destructive Testing (Wet Magnetic Particle Inspection) and radiographic examinations were carried out to verify weld quality and ensure compliance with applicable engineering standards.
03
Step

Mechanical Backfilling and Site Restoration

Upon successful completion of inspection activities, mechanical backfilling of the excavated ditch commenced using excavators. A total of 186 meters of ditch was backfilled while efforts continued to restore the work area to acceptable conditions.
04
Step

Integrity Protection and Project Closeout Activities

The next phase of the project includes the application of protective coatings, holiday detection testing, and completion of backfilling operations. These activities are essential for safeguarding the repaired pipeline against corrosion and ensuring long-term operational reliability.

Conclusion

The Sectioning for Leak Search and Sectional Replacement Project along the 10-inch Egbema West Delivery Line demonstrates Oceanklass Solutions Limited's commitment to pipeline integrity, operational excellence, and safe project delivery. Through rigorous inspection, quality assurance, and restoration activities, the project continues to enhance the reliability and performance of critical oil and gas infrastructure while maintaining the highest safety standards.

Project Information

Key Project Information at a Glance

Project Title

Sectioning for Leak Search and Sectional Replacement

Location

Mmahu, Rivers State, Nigeria

Pipeline Size

10"

Terrain

Land/Swamp

Execution Period

Ongoing

Repair Method

Sectional Replacement

Social Links

Completely synergize resource taxing.

Have a
project in
mind?