Oceanklass Solutions Limited, in partnership with Greenspan Concepts Limited, is currently executing mechanical bush clearing activities along the 10-inch Egbema West to Egbema Manifold pipeline corridor. The project is aimed at restoring and maintaining access to the pipeline Right-of-Way (ROW) to facilitate safe operations, inspection activities, maintenance programs, and pipeline integrity management.

The work involves the use of heavy-duty excavators to mechanically clear vegetation, shrubs, and other obstructions along the pipeline route. By maintaining a clear corridor, the project supports operational efficiency, enhances accessibility, and reduces potential risks associated with overgrown vegetation along critical oil and gas infrastructure.

As of the latest project update, a cumulative distance of 6,716 meters has been successfully cleared, demonstrating steady progress toward project completion.

Progress is measured not only by the distance covered but by the standards maintained throughout the journey. Our commitment remains delivering quality work safely and efficiently.

Project Management Team

Scope of Work

The project was designed to:

  • The scope of work for this project includes:

    • Mobilization of personnel, equipment, and materials to the project location.
    • Daily toolbox meetings and safety briefings before commencement of work.
    • Mechanical clearing of bushes, shrubs, and vegetation along the pipeline Right-of-Way.
    • Deployment and operation of excavators for vegetation removal.
    • Continuous monitoring of cleared sections to ensure compliance with project specifications.
    • Adherence to all Health, Safety, Security, and Environmental (HSSE) requirements.
    • Maintenance of access routes required for pipeline inspection and maintenance activities.
    • Daily progress monitoring, reporting, and documentation of completed work sections.
Mobilization of personnel and equipment
Survey
Site Restoration
Demobilization and project close-out

Working Process

Project Progress Update

On 27th May 2026, the project team successfully carried out mechanical bush clearing operations using two excavators. Excavator B achieved 234 meters of clearing, while Excavator C achieved 139 meters, resulting in a total daily achievement of 373 meters.

Despite operational challenges encountered with Excavator A due to a faulty turbocharger, work continued safely and efficiently, contributing to the cumulative progress recorded on the project.

01
Step

Mobilization and Site Preparation

The project commenced with the mobilization of personnel, excavators, and support equipment to the Egbema West pipeline corridor.
02
Step

Safety Briefing and Work Authorization

Prior to the commencement of daily operations, a toolbox meeting was conducted to communicate the day's objectives, hazards, control measures, and emergency response procedures.
03
Step

Mechanical Bush Clearing Operations

Mechanical bush clearing activities were carried out using excavators deployed along the pipeline Right-of-Way (ROW).
04
Step

Progress Monitoring and Reporting

Upon completion of daily activities, the cleared distance was measured and recorded to evaluate project performance against established targets.

Conclusion

The Mechanical Bush Clearing Project on the 10" Egbema West to Egbema Manifold Pipeline remains on track, with substantial progress already achieved. Through the deployment of skilled personnel, specialized equipment, and strict adherence to safety procedures, Oceanklass Solutions Limited continues to support the integrity and accessibility of this critical pipeline infrastructure.

The project team remains committed to completing the remaining bush clearing activities safely, efficiently, and in accordance with industry best practices while maintaining operational excellence throughout the execution period.

Project Information

Key Project Information at a Glance

Project Title

Mechanical Bush Clearing

Location

Egbema West, Rivers State, Nigeria

Contractor

Greenspan Concepts Limited

Client

Renaissance Africa Energy Company Limited

Execution Period

Ongoing

Repair Method

Bush Clearing